IT proposal for the City of Palmer

Every piece, in the new library

The network, server, and move plan for the New Palmer Public Library, 655 S Valley Way. Click the building to open it, then any floor or marker to see that part of the plan.

Prepared for
City of Palmer
Prepared by
Vicinity Group Inc.
Date
October 2026

MTA business internet

MTA fiber is the library's main internet connection. The City orders the circuit, and it enters the building in the network room, where it connects to the firewall.

Starlink Business on the roof

A Starlink dish on the roof is the backup connection. If MTA service drops, the firewall moves traffic to Starlink automatically and moves it back when MTA returns.

City Hall and Microsoft Azure

The library joins the City's network over an encrypted tunnel to the City Hall firewall, the same design as the City's other sites. With the recommended server option, the library's servers and virtual desktops run in Microsoft Azure over their own encrypted tunnel.

Roof and Starlink dish

The Starlink dish sits on a pipe mount on the roof above the network room, with a clear view of the sky.

Wi-Fi 7 access points

24 FortiAP 441K access points cover both floors, about one for every 830 square feet. Staff, public, and building devices each get their own network, and the public network has no path to staff or City systems.

Ten public computer seats

Each seat has a 27-inch monitor. In options 1 and 2, the seat is a Dell Pro Micro desktop. In options 2A and 3, it is a 10ZiG zero client that opens a virtual desktop on the library's desktop server or in Azure, so every session starts from the same clean image.

Staff computers

Staff computers at the circulation desk, in the workroom, and in the second-floor office connect to the staff network, with access to City resources. Staff keep their current computers, which Vicinity moves and reconnects.

Laptops patrons check out

Five Dell Pro 14 laptops that patrons check out at the circulation desk and use anywhere in the building on the public Wi-Fi.

Granite EPIK

MTA is retiring copper phone lines. Granite EPIK replaces them with a fully managed voice service over the internet. The lobby phone, and the fire alarm and elevator lines if they need one, plug into the EPIK unit in the network room.

FortiGate 120G

The firewall connects the library to MTA and Starlink, runs the encrypted tunnels to City Hall and Azure, and filters web traffic. Its security services include intrusion prevention, malware protection, and web and DNS filtering.

Four FortiSwitch 124G

Every network drop in the building patches into one of four switches. Each has 24 ports at 2.5 Gbps and powers access points and other devices over the network cable.

Patch panels

The construction contractor's cabling ends on labeled patch panels in this rack. Short patch cables connect each drop to a switch port.

Four APC Smart-UPS units

The battery backups keep the firewall and switches running through short power outages and report their status to Vicinity's monitoring.

Server and Datto backup

In options 1 and 2, the server and a Datto SIRIS backup appliance sit in this rack. Option 2A adds a second server for the public desktops. With Azure, this space stays open.

The proposal

Ready on opening day

The new Palmer Public Library at 655 S Valley Way is scheduled to finish in Q3 2027. The library’s current server is a 2018 Dell PowerEdge T330 that has been out of warranty since October 2023, and the Windows Server 2016 systems on it reach end of support on January 12, 2027. The network at the temporary Arctic Avenue location runs on routers, firewalls, and access points that are past manufacturer support.

This proposal covers what the new building needs on opening day. It includes a Fortinet network that joins the City’s network design, four options for replacing the library server compared on five-year cost, and a move plan that brings both online before the doors open.

20,000square feet across two floors
24Wi-Fi 7 access points
3server options compared over five years
Q3 2027scheduled opening

Where things stand

The library's current systems reach end of life before the move

Vicinity inventoried the library’s systems through the City’s monitoring platform on October 7, 2026. Every major component has already reached end of support or will reach it before the new building opens. The deadline that drives the schedule is January 12, 2027, when Windows Server 2016 support ends.

The City is already moving its sites off Metro Ethernet onto business internet, with each site joined to City Hall over an encrypted tunnel. The new library is the natural place to build that design from the start.

Building network

One Fortinet network that joins the City's design

The City has standardized on Fortinet for firewalls, switching, and wireless, so the library joins the same management console as City Hall and the other sites. A FortiGate 120G connects the building to the City Hall FortiGate over an encrypted tunnel and gives the library its own internet path, so a City Hall outage doesn’t take the library offline.

2internet connections, MTA with Starlink as automatic backup
24Wi-Fi 7 access points, about one per 830 square feet
4switches with power for every access point at full strength

A Starlink Business connection backs up the MTA circuit, and the FortiGate switches traffic to it automatically if MTA service drops. The library keeps three separate networks for staff, public, and building devices. The firewall’s security services close the web filtering gap noted in the City’s 2026 cyber insurance renewal. MTA is retiring analog phone lines, so the building’s analog devices connect through a Granite EPIK unit instead.

Library server

Four ways to replace the library server

The library runs three systems: a domain controller, a file and application server, and the library management PC. Vicinity priced four ways to replace the 2018 server and compared them on what each costs the City over five years, including licensing, backup, public computers, and installation. Option 2A is option 2 with a second on-site server that runs the public desktops, as the City asked.

Option 1 Dell PowerEdge R360 1U rackmount server in the library's network room $139,156.90 five-year cost $66,221.90 upfront, including public computers, then $1,105.00 a month
Option 2 Supermicro server (Thinkmate) 1U rackmount server in the library's network room $124,209.80 five-year cost $51,274.80 upfront, including public computers, then $1,105.00 a month
Option 2A Supermicro servers with on-site virtual desktops Option 2's server, plus a second server in the network room that runs shared Windows desktops (Remote Desktop Services) for the public seats $197,328.50 five-year cost $109,193.50 upfront, including public computers, then $1,105.00 a month

Vicinity recommends Azure, option 3. Over five years it costs $3,541.90 less than option 2, $18,489.00 less than option 1, and $76,660.60 less than option 2A, including the public computers and installation each option needs. It has no server hardware to buy or replace, and the public desktops are managed from one image. The tradeoff is that file shares and sign-in run over the library's internet connection, so an internet outage interrupts them. The network plan includes a Starlink backup connection that takes over automatically if MTA service drops.

Caution

Vicinity cautions against option 2A. Remote Desktop Services is an older Microsoft technology. Microsoft's work on shared desktops has moved to Azure Virtual Desktop and Windows 365, and RDS gets few new features. In previous deployments we have seen, it has been prone to errors and poorly received by clients and by the people using them. It is also the most expensive option, at $73,118.70 more than option 2 over five years, which is a high price for what it delivers.

Whichever option the City chooses, Vicinity moves the library’s systems onto it at the current library before Windows Server 2016 reaches end of support on January 12, 2027.

Move plan

Network live before the doors open

The timeline works backward from a Q3 2027 opening, the current estimate from H5 Construction. Server and network lead times are set by the manufacturers at the time of order.

  1. Q4 2026Scope approvedThe City approves the server and network scope so equipment can be ordered at current pricing.
  2. Q4 2026 to Q1 2027Server replaced at the current libraryVicinity moves the domain controller, file server, and library management PC onto the option the City chooses, either Azure or a new server at the Arctic Avenue library, before Windows Server 2016 support ends January 12, 2027. The 2018 server retires before the move.
  3. Q1 2027Internet ordered for the new buildingThe City orders MTA service at 655 S Valley Way. Fiber construction to a new building can take 90 to 180 days.
  4. Q2 2027Network staged offsiteVicinity configures the firewall, switches, and access points on the bench, including the encrypted tunnel to City Hall and the separate staff, public, and building networks.
  5. Q2 2027, 4 to 6 weeks before openingNetwork live in the buildingVicinity installs the rack equipment, patches the contractor's cabling, mounts the access points, and tunes Wi-Fi coverage room by room.
  6. Q3 2027, openingLibrary moves inWith an on-site server, it moves to the new rack. With Azure, the library's systems are already running in the cloud. Staff and public computers connect, and online database vendors receive the library's new public IP address.

Working together

What this plan depends on

This plan rests on a few things outside Vicinity’s scope. Where one turns out differently, Vicinity raises it before work continues and adjusts the scope and price in writing.

  • The construction contractor delivers the cabling, the network rack, and rack power. The contractor or City maintenance mounts the Starlink dish.
  • MTA internet is available at 655 S Valley Way, and the City orders it. Starlink is the backup.
  • Analog phone, fire alarm, and elevator lines move to Granite EPIK.
  • If the City files for E-rate, its schedule sets the network purchase date.

Investment

The numbers, in one place

$62,146.00building network, one-time and first-year costs
$1,651.67a month for the recommended Azure servers, with licensing and backup
$120,667.90five-year cost of the recommended Azure option with public computers and installation, the lowest of the four

Items marked as pricing in progress will be added to the formal proposals.

Next steps

Two steps to approve the plan

The City approves the work in two steps. Each proposal can be downloaded as a PDF, and signed electronically through Docusign.

Step 1: Approve the building network

The building network is the same in every server option, so the City approves it first.

Network hardware and installation

FortiGate firewall, four FortiSwitches, 24 FortiAP Wi-Fi 7 access points, battery backup and rack power, patch cabling, Starlink backup internet, and installation.

Download PDF Sign with Docusign

Docusign link coming soon.

Step 2: Choose a server option

Each option covers the library's servers, public computers, checkout laptops, licensing, backup, and moving the library's systems. The City signs the one it chooses.

Option 1

Dell PowerEdge R360 on site

Dell server in the network room, Windows Server 2025 licensing, Datto SIRIS backup, 10 Dell Pro Micro public computers with 27-inch monitors, 5 Dell Pro 14 checkout laptops, the build, and the migration.

$139,156.90 five-year cost

Download PDF Sign with Docusign

Docusign link coming soon.

Option 2

Supermicro server on site

Supermicro server with a 5-year warranty in the network room, Windows Server 2025 licensing, Datto SIRIS backup, 10 Dell Pro Micro public computers with 27-inch monitors, 5 Dell Pro 14 checkout laptops, the build, and the migration.

$124,209.80 five-year cost

Download PDF Sign with Docusign

Docusign link coming soon.

Option 2A

Supermicro servers with on-site virtual desktops

Option 2's server plus a second Supermicro server running Remote Desktop Services, Windows Server 2025 and Remote Desktop licensing, Datto SIRIS backup for both servers, 10 10ZiG zero clients with 27-inch monitors, 5 Dell Pro 14 checkout laptops, the build, and the migration.

$197,328.50 five-year cost